Page 9 - Dental Technology 12-3
P. 9

8-12-NONDAS VLACHOPOULOS-Q8_6-7-8-Ivoclar.qxd  10/6/2022  8:07 PM  Page 2





                                                                                        prosthetic section 09
              DENTAL TECHNOLOGY, JULY-SEPTEMBER 2022


















              FIG 9                                    FIG 10                                    FIG 11
















              FIG 12                                   FIG 13                                    FIG 14
















              FIG 15                                   FIG 16a                                   FIG 16b















              FIG 17a                                  FIG 17b                                   FIG 18
















              FIG 19                                   FIG 20                                    FIG 21



              ity  and  aesthetics.  The    path  of  insertion,  bar STL file is sent (exported) to the milling  and  additional  use  should  be  made  of
              available  space,  bar  morphology,  dimen-  center and the titanium bar is milled. Then  chemical etching with metal primer on the
              sions,  occlusal  plane,  peri-implant  papilla  the bar is repositioned on a manual milling  bar and ceramic primer inside the zirconia
              space,  soft  tissue  areas,  are  all  important  machine in order to do the final combined  frame. Important is the soft tissue contact
              factors to be considered  during the design  milling.  Two different inclinations are cho-  and emergence of the prosthesis in the soft
              process.                                  sen,  0  degrees  in  the  neck  area  and  4  tissue region.  This area is designed as pon-
                During the design process, it is important  degrees on the rest of the bar.       tic of a bridge to facilitate self-cleaning and
              to double check and verify with the pre op   This  is  done  in  order  to  minimize  the  hygiene of the area (Figures 23 & 24).
              STL of the interim prosthesis, that the bar is  cement  space  especially  in  the  neck  area,  Accordingly, the peri-implant soft tissue
              placed in such a position so as to ensure the  but also to avoid stresses when the bar is fit  should  be  pressure  free.  Finally,  the  final
              required  thickness  of  zirconia  intraorally  inside the zirconia frame (Figure 17).  control and comparison with the pre op STL
              (Figure 16).                                The  final  surface  of  the  bar  should  be  file  is  done,  in  order  to  verify  that  the
                 After the end of the design process, the  sandblasted  with  50m  aluminum  oxide,  design is identical to the original certified
   4   5   6   7   8   9   10   11   12   13   14